Twelve weeks. Seven well-defined stages. The same two people from your first phone call to the day we hand you the automation app login. Here's how a Pool Sharp pool actually gets built.
We come to you. Jeb walks the property — slope, view, sun, soil, setbacks — and sketches a first layout right on a clipboard while Michael scopes the build, standing in the yard with you.
You'll get a real read on what's possible on your specific lot, a ballpark budget that isn't theoretical, and an honest "yes / no / let's talk" on the timeline you're working with.
We turn the consultation sketch into a full 3D rendering with both daytime and evening lighting passes. You see the pool, the deck, the spa, the fire bowls — exactly as it will sit — before a single shovel hits dirt.
Once you sign off on the render, we engineer it: structural drawings, hydraulics, electrical, gas. That's what gets stamped, permitted, and bid against.
Dig day. The basin is cored to the engineered depths. In the Hill Country we're often running into a limestone shelf or caliche layer — we call that out the same day, and adjust the design before it becomes a surprise on your invoice.
Rebar cage tied to the engineered drawings. Suction lines, return jets, main drain, light niches, and gas runs are roughed in. The pool's "skeleton" is locked in before any concrete touches it. City inspection signs off.
Gunite is shot pneumatically into the steel cage and hand-troweled into shape — including the benches, the steps, the spa, and any custom raised features. The 28-day cure begins.
Waterline tile is set, coping is laid, and the surrounding deck is poured or stone-laid. This is when the pool finally starts to look like the render — and when most of our clients send us their first "wow" text.
Pebble plaster is troweled in. Water on. We walk you through startup chemistry, the automation app, and what to watch for in your first month of ownership. Then we hand you the keys.
We don't disappear after fill day — we service every pool we build, for as long as you own it.
Most builds break ground 6–10 weeks after the first call. We're booking design consultations 2 weeks out.